• jeu de construction, en trois temps – stéphane leclerc – 2018 - final
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - final
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - final
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - final
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - final
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - before
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - making of
  • jeu de construction, en trois temps – stéphane leclerc – 2018 - making of

Hydro-Quebec called upon MU to create a mural for the fencing around their building located at 600 Rue Fullum. This mural was created by Stéphane Leclerc, who was assisted by MU’s team and Café Graffiti members. The formal elements of the mural were inspired by the local scenery, various geometric shapes found at the port, the Jacques-Cartier bridge and architecture. This triptych composition pays tribute to the city, which is constantly reinventing itself. Illuminated at night, the mural echoes the spectacular lights of the nearby Jacques Cartier Bridge.



600 Rue Fullum, Montréal, QC H2K 3L6 GET DIRECTIONS
600 Rue Fullum, Montréal, QC H2K 3L6 GET DIRECTIONS
PARTNERS:

Artist - Stéphane Leclerc

Project - Hommage à la Petite-Bourgogne – Roadsworth – 2016